Hospitality guest room with a panelled headboard

Hotels

Develop repeatable guest-room finish schedules that can accommodate room variants.

How the work is organised

A hotel project usually starts with a typical guest room, so the finish schedule can be settled on one room type before it is adapted to the others. Tilesco then works through the room variants, suites, corridors and public areas, keeping the same floor, wall and joinery language throughout, and noting where a finish changes because of the room size, the view or the way the room will be used. Samples are reviewed against the plan and against the light in each room type, so decisions made for the typical room still work when they are repeated across the building.

What is included

The scope can cover floor and wall tiles, stone and timber-look surfaces, sanitary ware and fittings, doors and joinery, wardrobes and storage, lighting and hardware, and the trims that finish each junction. For bathrooms, the selection also covers the build-up beneath the visible finish, including waterproofing and drainage details that need to be agreed with the builder before work starts. Each item is listed room by room and by room type, so the client can see what is included, what is still to be confirmed, and where a finish is repeated to keep the hotel feeling consistent.

How the client works with us

Clients usually share floor plans, room dimensions, reference images and any finishes already chosen, and tell us which room types matter most and when the work needs to start. Tilesco then prepares a room-by-room schedule and a set of samples for review, and updates the schedule as choices are confirmed. Before delivery, the client checks the final schedule, delivery address and access arrangements, and confirms the order in which rooms and floors will be handed over, so materials arrive in the sequence the site needs them.

Explore projectsGet a Free Quote
WhatsAppEmail